A secure new facility for Storage Spot
Address
3 Digitaria Drive,Gledswood Hills NSW
Project Type
Storage facility
Site Area
6,209 sqm
Building Gross Floor Area
7,581 sqm
Storage Spot required a premium, multi-level storage facility capable of accommodating a high volume of units while maintaining operational efficiency and security. We completed this quality development ahead of program and under budget.


Engineered for capacity, safety and efficiency
The structural design includes a steel portal frame, precast panels, and metal cladding, maximising durability and visual appeal. With 166 sqm of office space, four 1,500 kg goods and passenger lifts, and a 93 m³ concrete in-ground OSD tank, this was a sizable project.
Our in-house project management team ensured a smooth process from design to completion and handover, with the project finishing ahead of schedule and well within the client’s budget.
Details
We delivered a two-level storage complex on a 6,209 sqm site, with a building gross floor area of 7,581 sqm housing 511 individual units. The facility is also fitted with state-of-the-art security and CCTV systems, ensuring efficiency, safety and reliability.




“The whole process from start to finish with design, of helping with the feasibility, and of minimising construction costs, all help in our process of getting the best return on investment.”Ian Rodrigues Director / Pioneer Investment Group
511 storage units
511
67 tonnes of steel
67
1,466 sqm of class 2 precast panels
1466